Coal River Railway Co.: Employee Timetable No. 11 Effective February 2, 1908
The Coal River Railway was incorporated in 1905 to buld a line up the Coal River from the C&O main line at St. Albans, W. Va. It eventually aggregated 68 miles of track and was operated by the C&O from the date of is organization until it was merged into C&O in 1909. (See next page for corporate history).
This employee timetable shows operations just before the merger into C&O.
6 pgs.